Falls Fabrication
Steel · CNC · Coatings
(940) 555-0182 Send Drawings
Wichita Falls, Texas — AWS Certified Shop

From plate to powder coat.
One P.O.

Fiber laser cutting, forming, certified welding, CNC machining and in-house powder coating — production runs and one-offs, cut to your print and shipped on the date we quote.

Send Your Drawings Call the Shop or dial (940) 555-0182
6kW FIBER LASER TO 1" PLATE 175-TON BRAKE AWS D1.1 WELDS POWDER IN-HOUSE
Since 2011Job shop & production
1,900+ Jobs/yrOne-offs to 10k-piece runs
97.2% On-TimeTrailing 12 months
Certs On FileMaterial traceability
What we run

Capabilities

Five workcenters under one roof — your part never waits on an outside vendor.

01

Fiber Laser

6kW fiber laser on a 5' × 10' bed — clean edges, tight nests, fast turns.

  • Mild steel to 1" plate
  • Stainless to 1/2"
  • Aluminum to 3/8"
02

Press Brake

175-ton × 12' CNC brake with offline bend simulation — repeatable to the degree.

  • 12' max bend length
  • Precision tooling library
  • First-part-good setups
03

Certified Welding

MIG and TIG in steel, stainless and aluminum — welders qualified to AWS D1.1.

  • Weldments to 4,000 lb
  • Fixtured production welds
  • Weld maps on request
04

CNC Machining

3-axis mills and CNC turning for machined details, tapped holes and finish passes on fab work.

  • Milling to 40" × 20"
  • Turning to 14" dia
  • ±0.001" where it counts
05

Powder Coating

In-house blast, prep and powder line — parts ship finished, not "ready for your painter."

  • Booth to 8' × 8' × 20'
  • Standard + custom colors
  • Batch or production flow
06

Kitting & Delivery

Parts labeled, kitted by assembly and delivered on our truck inside 100 miles.

  • Bagged & tagged hardware
  • Job-site drops
  • Blanket-order releases
Oil & Gas Ag Equipment Construction Food Processing Defense Subcontract
Paper trail included

Quality

Every job travels with its documentation — so your receiving department has nothing to chase.

  • 1
    First-article inspectionDimensional report on the first part of every new job, before the run starts.
  • 2
    Material certs on fileHeat numbers tracked from receiving to shipment — MTRs sent with your parts.
  • 3
    Calibrated instrumentsGauge calibration on schedule, records available on request.
Equipment List — Primary Workcenters
MachineSpecWorkcenter
Fiber Laser — 6kW5' × 10' bed · 1" MS / 1/2" SSCutting
CNC Press Brake175 T × 12' · 7-axis backgaugeForming
MIG / TIG Bays (4)AWS D1.1 · steel, SS, alumWelding
Vertical Mills (2)40" × 20" travelsMachining
CNC Lathe14" dia × 40" centersMachining
Blast Cabinet + Powder Line8' × 8' × 20' booth · batch ovenCoating
No phone tag

Send Your Drawings

DXF, STEP or a PDF print — we quote from what you have. Submissions are acknowledged the moment they land and quoted same business day in most cases.

  • 1
    Attach the printOr describe the part — we build drawings for napkin sketches weekly.
  • 2
    Instant acknowledgmentYou get an RFQ number back immediately, day or night.
  • 3
    Quote with a real datePrice, material and a ship date we intend to hit — not a guess.
Drop drawings here or click to attach
DXF · STEP · PDF · DWG — up to 25 MB
After-hours RFQs are logged and acknowledged automatically.
✓  RFQ #2215 received — you'd get an email confirmation right now. (Demo form — nothing was sent.)